Show HN: DashPrompts – describe a dashboard, get a working Power BI file
Alhumdulillah I've been building DashPrompts solo. You upload a CSV or Excel file, describe what you want in plain English (or leave the promptblank), and then it generates a Power BI dashboard as a pbip zipped file.. Tables, DAX measures, a themed report with charts/cards laid out on the dashboard. It's free, no signup required for the basic 1-page generator. I myself am between beginner and intermediate with Power BI, this tool was inspired from the pain of slowly setting up a dashboard with d
阅读原始来源来源记录
指标快照
points · 2 votes
2026-11-28 17:11:55.437Z
cumulative since publication
研究分析
变化记录
来源描述:Alhumdulillah I've been building DashPrompts solo. You upload a CSV or Excel file, describe what you want in plain English (or leave the promptblank), and then it generates a Power BI dashboard as a pbip zipped file.. Tables, DAX measures, a themed report with charts/cards laid out on the dashboard. It's free, no signup required for the basic 1-page generator. I myself am between beginner and intermediate with Power BI, this tool was inspired from the pain of slowly setting up a dashboard with d
版本与成本证据
来源票数: 2 votes (2026年11月28日 UTC; cumulative since publication)
适用与受影响对象
先明确变化影响的现有工作流,再判断是否升级。发布热度不证明效果提升;接口、价格或可用性变化也可能增加迁移工作。
缺失的比较信息
待补齐:新旧行为、受影响套餐与地区、生效时间、兼容性、回退路径及同一工作量下的成本。
采用与迁移验证
保存发布或政策原文,对新旧方案运行同一个任务并比较结果与完整账单;若涉及停服,先核验截止时间再安排迁移。